Products

NIGERIA · OML-30

Mature field redevelopment

Operated 9 fields & 240 wells; lifted output 13k → 78k BOPD in 18 months.

REP. OF CONGO · EX-ENI

Bypassed asset revival

3 under-developed fields reviewed; drill-and-intervene plan delivered in under 6 months.

TEXAS, USA · HELIUM

Bypassed gas monetization

Bringing shut-in, helium-rich gas back on-line with modular surface infrastructure.

UPSTREAM FIELD DEVELOPMENT  PROJECT:  NIGERIA

Evaluate and Develop Existing Wells on Mature and Undeveloped Asset Set and Increase Production

  • Project: OML-30 Nigeria
  • Operator: Shell Exit – Heritage Oil Limited (Acquisition)
  • Fields: Nine
  • Existing Wells: 240
  • New Wells: 40
  • Well Design (Drilling Program)
  • Field Planning and Development (G / B)
  • Geoscience and Reservoir Engineering
  • Production Optimization and AL (GL, ESP)
  • Well integrity and facilities
  • Well Control and Relief Well Design
  • Feasibility Studies
  • Technology Selection / Evaluation
  • Drilling contracting

 

Empowering Oil and Gas Operators to Maximize Asset Value and Achieve Ambitious Goals. Through Innovation, Strategic Decision-Making, and Actionable Insights, We Enable Clients to Optimize Investments and Drive Success

Highlighted Deliverables:

  • Optimized (Ranked) Fields, Well Interventions to increase production in wells with high potential
  • Optimize well interventions and drilling sequence
  • Field Development Plan
  • Reserves Estimation Reports (3 Fields)
  • Review of Artificial Lift systems Run 1st ESP Systems in Heavy Oil Optimize G/L Systems
  • Report for Side-tracks applications for CSG 9 5/8”

Asset Management Optimization

UPSTREAM FIELD DEVELOPMENT PROJECT: REPUBLIC OF CONGO

Digitization of Brown Field Assets to build field integrity and Optimize FDP over time

Asset Management Strategy

  • Reservoir Engineering
  • Production Engineering
  • Well and Facilities Integrity
  • Match and Drive New Technology
  • Well & Casing Design adapted to field challenges.
  • Downhole gauges systems installed
  • Surface telemetry sensors
  • Well Integrity System in place
  • Production management system applied
  • Quality Assurance & Reliability KPI’s
  • History Matching

 Well Site, Facility, Organization 

  • 3 Active Fields (Ex-ENI Operated Under-Developed)
  • 9 Inactive Wells
    • 8 Wells Mechanical Issues
    • 4 Wells New Drilling Campaign (Active)
  • Increased Production: 1100 BOPD (900 BOPD Now)
  • Campaign Planned for 2026 214 Wells – Horizontals
Scroll to Top