NIGERIA · OML-30
Mature field redevelopment
Operated 9 fields & 240 wells; lifted output 13k → 78k BOPD in 18 months.
REP. OF CONGO · EX-ENI
Bypassed asset revival
3 under-developed fields reviewed; drill-and-intervene plan delivered in under 6 months.
TEXAS, USA · HELIUM
Bypassed gas monetization
Bringing shut-in, helium-rich gas back on-line with modular surface infrastructure.
UPSTREAM FIELD DEVELOPMENT PROJECT: NIGERIA
Evaluate and Develop Existing Wells on Mature and Undeveloped Asset Set and Increase Production
- Project: OML-30 Nigeria
- Operator: Shell Exit – Heritage Oil Limited (Acquisition)
- Fields: Nine
- Existing Wells: 240
- New Wells: 40
- Well Design (Drilling Program)
- Field Planning and Development (G / B)
- Geoscience and Reservoir Engineering
- Production Optimization and AL (GL, ESP)
- Well integrity and facilities
- Well Control and Relief Well Design
- Feasibility Studies
- Technology Selection / Evaluation
- Drilling contracting
Empowering Oil and Gas Operators to Maximize Asset Value and Achieve Ambitious Goals. Through Innovation, Strategic Decision-Making, and Actionable Insights, We Enable Clients to Optimize Investments and Drive Success
Highlighted Deliverables:
- Optimized (Ranked) Fields, Well Interventions to increase production in wells with high potential
- Optimize well interventions and drilling sequence
- Field Development Plan
- Reserves Estimation Reports (3 Fields)
- Review of Artificial Lift systems Run 1st ESP Systems in Heavy Oil Optimize G/L Systems
- Report for Side-tracks applications for CSG 9 5/8”
Asset Management Optimization
UPSTREAM FIELD DEVELOPMENT PROJECT: REPUBLIC OF CONGO
Digitization of Brown Field Assets to build field integrity and Optimize FDP over time
Asset Management Strategy
- Reservoir Engineering
- Production Engineering
- Well and Facilities Integrity
- Match and Drive New Technology
- Well & Casing Design adapted to field challenges.
- Downhole gauges systems installed
- Surface telemetry sensors
- Well Integrity System in place
- Production management system applied
- Quality Assurance & Reliability KPI’s
- History Matching
Well Site, Facility, Organization
- 3 Active Fields (Ex-ENI Operated Under-Developed)
- 9 Inactive Wells
- 8 Wells Mechanical Issues
- 4 Wells New Drilling Campaign (Active)
- Increased Production: 1100 BOPD (900 BOPD Now)
- Campaign Planned for 2026 214 Wells – Horizontals