MAD-ERA GLOBAL CASE STUDIES TRANSFORMING WASTE INTO VALUE

DRILL CUTTINGS & OBM TREATMENT

  • Successfully executed 500 PLUS large-scale remediation projects for major operators.

  • Dramatically reducing TPH & Chloride levels to meet strict state & local environmental standards.

No.

Project Description

Project Name

Customer Operator       (Location)

Treatment Volume (Lab)

1

 Remove OBM/Drill Cuttings

 Draw State # 1

New Mexico (OCD)

 217,000 to 496mg/kg  (Cardinal)

2

 Remove OBM/Drill Cuttings

 Draw State #2

New Mexico (OCD)

 197,000 to 10,800mg/kg (Cardinal)

3

 Remove OBM/Drill Cuttings

 Draw State # 3

New Mexico (OCD)

 227,480 to 592mg/kg (Cardinal)

4

 Remove OBM/Drill Cuttings

 Draw State #4

New Mexico (OCD)

 212,000 to 10,300mg/kg (Cardinal)

5

 Remove OBM/Drill Cuttings

 Draw State # 5

New Mexico (OCD)

 186,000 to 396mg/kg (Cardinal)

6

 Remove OBM/Drill Cuttings

 Draw State # 12

New Mexico (OCD)

 212,000 to 486mg/kg (On-Site)

7

 Remove Chlorides/Drill Cuttings

 Draw State # 16

New Mexico (OCD)

 202,000 to 1,146mg/kg (On-Site)

8

 Remove Chlorides/Drill Cuttings

 Draw State # 18

New Mexico (OCD)

 197,000 to 816mg/kg (On-Site)

9

 Remove Chlorides/Drill cuttings

 Draw State # 21

New Mexico (OCD)

 184,000 to 352mg/kg (On-Site)

10

 Remove Chlorides/Drill Cuttings

 Draw State # 22

New Mexico (OCD)

 197,000 to 795mg/kg (On-Site)

SPILL & SOIL REMEDIATION

  • Completed extensive on-site remediation for diesel, oil, OBM, and chloride spills across various states.
  • Restored contaminated soil and sand, ensuring rapid environmental compliance and site recovery.
No.
Project Description
Project Name
Customer Operator       (Location)
Treated Volume (Lab)
11
 Remove OBM/Drill Cuttings
 Flage Ranch #1 
Texas
 185,000 to 979mg/kg (On-Site)
12
 Remove OBM/Drill Cuttings
Cado Bay #1H
 Texas
 202,000 to 379mg/kg (On-Site)
13
 Remove OBM/Drill Cuttings
 Pee Wee #1H
Texas
 162,000 to 816mg/kg (On-Site)
14
 Remove OBM/Drill Cuttings
 Eagle Claw 58 Federal Com # 005H
New Mexico
 197,000 to 1,187mg/kg (On-Site)
15
 Remove OBM/Drill Cuttings
 Caza Ridge State #1H 
 New Mexico
 204,000 to 985mg/kg (On-Site)
16
 Remove Diesel TPH/Sand/Soil Spill
 TCEQ Diesel Spill
 Texas
 5,800 Yards/Soil (On-Site)
17
 Remove Chlorides & Oil/Sand Soil (AST Burst) Spill
 Oil Spill #1 BHP
 Texas
 19,786 Yards/Soil (On-Site)
18
 Remove Oil/Sand & Soil Spill
Oil Spill #1 Latigo
 Texas
 1,700 Yards/Soil (On-Site)
19
 Remove Oil/Sand & Soil Spill
Oil Spill #1 Apache
 New Mexico-BLM
 4,674 Yards/Soil (On-Site)
20
 Remove Oil/Sand & Soil Spill
Oil Spill #2 Apache
New Mexico-BLM
 3,251 Yards/Soil (On-Site)

OIL RECOVERY FROM PRODUCED WATER LAGOONS

  • Deployed advanced separation systems to recover trapped oil and condensate from frac ponds and storage lagoons.
No.
Project Description
Project Name
Customer Operator       (Location)
Treated Volume (Lab)
21
 Remove Oil/Sand, Soil (Lake)
 Oil Spill
Texas
 51,000 Yards/Soil (On-Site)
22
Remove Oil / storage pond
Bear SWD # 1
NM
Recovered 35,246 bbls oil off  lagoon
23
Remove Oil / storage pond
Bear SWD # 2
NM
Recovered  82,000 bbls off lagoon
24
Remove Oil / storage pond
Bear SWD#5
ND
Recovered 25,432 bbls off lagoon
25
Remove Oil / storage pond
Bear SWD#7
ND
Recovered 21,934 bbls oil off lagoon
26
Remove Oil / storage pond
Ft. Apache water lagoon
PA
Recovered 112,000 bbls oil and  condensate off frac pond
27
Remove Oil / storage pond
Catskill frac pond
Oklahoma
Recovered 18,642 bbls oil and condensate off frac pond
28
Remove Oil / storage pond
Elmymira lagoon #4
CO
Recovered 111,365 bbls oil off 3,000,000 bbl frac pond
29
Remove Oil / storage pond
Spade 18 3501
Texas
Recovered 19,230  bbls off frac pond
30
Remove Oil / storage pond
Spade 18 4801
Texas
Recovered 9,800 bbls off frac pond

GAS FLARE UTILIZATION (DIGITAL PIPELINE)

  • Eliminated routine venting and flaring by monetizing stranded methane through on-site power generation and mobile data centers.
  • Processed volumes ranging from 1,000 to 5,000 MCF/Day per project, generating significant annual returns while minimizing carbon footprint.
No.
Project Description
Customer (Location)
Volume (Value)

1

Associated Low BTU Methane Gas (AG) Utilization from Helium

Expansion 2025: He Plant Expansion in Association with Gas Plant

Potter County,Texas USA

 

 

2500 MCF/Day $7.3M/Year

(~$8/MCF)

Expansion 2026: 13MW Power

2

Stranded Methane Waste Gas Recovery (20+ Mobile Data Centers on 2900 Wells)

Medina, Ohio USA

1,000 MCF/Day

$2.7M/Year (~$7.6/MCF)

3

Coal Bed Methane Waste Gas Recovery, Eliminating Venting and Flaring

Pittsburgh, Pennsylvania USA

4,000 MCF/Day

$11M/Year + RECs ($.03/kWh)

4

Economically Stranded Gas Utilization, Developing 100+ Mobile Facilities

Midland Basin, Texas USA

1,000-5,000 MCF/Day

$2.8M/Year – $14M/Year